Drainage and flood control improvements

Barbara Drive Drainage Phase 3 LF 

$6,930,000 

Construct the upgrade of an existing undersized storm drain system to include curbs, sidewalks, and driveway approaches as applicable and within available funding. This is a multi-phase project to relocate the floodplain away from structures. 

 

Brookside Outfall

(Esma Street Phase 2)

(Lebanon Street to San Antonio River Tributary) LF 

$4,150,000 

Construct channel improvements, culvert replacements and associated roadway reconstruction, curbs, and driveway approaches at culvert crossings as applicable and within available funding. This is a multi-phase and Hazard Mitigation Action Plan project. 

Eisenhauer Road Northwood-Devonshire Drive Area Drainage Phase IA

(Pike Road from Albin to Brookside) 

$11,150,000 

Install an underground storm drain system and channel improvements to include associated roadway reconstruction, curbs, sidewalks, and driveway approaches as applicable and within available funding. This is a multi-phase and Hazard Mitigation Action Plan project. 

 

Elmira Area Drainage

(Camaron Street from Elmira to Santa Rosa Street) LF 

$6,050,000 

Install an underground storm drain system and associated roadway reconstruction, curbs, sidewalks, and driveway approaches as applicable and within available funding. This is a Hazard Mitigation Action Plan project. 

Evans Road Drainage Phase 1

(East Elm Creek to Masonwood) 

$8,450,000 

Install an underground storm drain system and associated roadway reconstruction, curbs, sidewalks, and driveway approaches as applicable and within available funding. 

 

Fox Run Area Drainage

(Between Fox Peak Drive and Fox Creek) 

$1,000,000 

Install an interceptor drainage channel and associated improvements as applicable and within available funding. 

 

Frio City Road Outfall Phase 1

(Pendleton Avenue from outside Union Pacific Railroad right-of-way to San Pedro Creek) 

$11,300,000 

Upgrade an underground storm drain system which may include associated roadway reconstruction, curbs, sidewalks, and driveway approaches, as applicable and within available funding. This is a Hazard

Mitigation Action Plan project. 

 

Gardendale Drainage

(Wurzbach Road to Bluemel Road) 

$3,360,000 

Install an underground storm drain system which may include associated roadway reconstruction, curbs, sidewalks and driveway approaches as applicable and within available funding. 

 

George Road Low Water Crossing

(Hunters Bow to NW Military Highway) 

$3,700,000 

Construct low water crossing and associated improvements as applicable and within available funding. 

 

Lower French Creek Drainage

(Low Bid Lane to Leon Creek) LF 

$6,500,000 

Construct improved low water crossings, driveway culverts, and channel improvements as applicable and within available funding. This is a Hazard Mitigation Action Plan project. 

 

Marbach Road Area Drainage

(Loop 410 to Horal Drive) 

$15,800,000 

Upgrade an undersized existing storm drain system which may include associated road reconstruction, curbs, sidewalks, and driveway approaches as applicable and within available funding. This is a Hazard Mitigation Action Plan project.

North New Braunfels

(Austin Hwy to Larkwood) Design Only 

$1,000,000 

Complete preliminary project development which may include schematic design and plans for drainage and associated improvements as applicable and within available funding. 

 

Oak Haven Area Drainage

(Kentwood Phase 2) 

$7,900,000 

Install an underground storm drain system which may include associated reconstruction of the roadway, curbs, sidewalks, and driveway approaches as applicable and within available funding. 

 

Peggy Drive Area Drainage

(Eastgate Subdivision) 

$20,000,000 

Complete the regrading of an existing earthen channel and installation of an underground storm drain system and associated reconstruction of streets with curbs, sidewalks, and driveway approaches as applicable and within available funding. 

 

Perennial Drive Area Drainage

(Heimer Road to Dutch Myrtle) 

$2,750,000 

Install an underground storm drain system and associated roadway reconstruction, curbs, sidewalks, and driveway approaches as applicable and within available funding. 

 

Quentin Drive Alley Interim Improvements

(Kampmann Boulevard to detention pond) 

$973,000 

Reconstruct the alley and associated improvements between Leming Drive and Quentin Drive as applicable and within available funding. 

 

Seeling Drainage Phase 4

(Lowery Drive to St. Cloud and Placid Drive from Sage to Pardo) LF 

$7,880,000 

Install an underground storm drain system and associated roadway reconstruction to include curbs, sidewalks, and driveway approaches as applicable and within available funding. This is a multi-phase and Hazard Mitigation Action Plan project. 

 

South Pine Roadway Drainage Phase 2

(Greer Street, Vanderbilt Street, and South Palmetto Street) 

$11,000,000 

Install an underground storm drain system and associated roadway reconstruction, curbs, sidewalks, and driveway approaches as applicable and within available funding. This is a multi-phase project. 

 

Southwell North Area Drainage

(Southwell Road and Melba Drive) 

$5,930,000 

Install an underground storm drain system and an earthen channel outfall to include associated roadway reconstruction, curbs, sidewalks, and driveway approaches as applicable and within available funding. This is a Hazard Mitigation Action Plan project. 

 

Valley Hi Area Drainage - Medina Base Phase 1 

(Ray Ellison Boulevard from Medina Base Road to Old Valley Hi Drive) LF 

$5,700,000 

Install an underground storm drain system which may include improvements to two low water crossings, reconstruction of existing roadside earthen ditches and associated roadway reconstruction, curbs, sidewalks, and driveway approaches as applicable and within available funding.

 

West Broadview Drive & Oakwood Drive Drainage Phase 1

(West Broadview Drive and West Quill Drive) 

$10,400,000 

Install an underground storm drain system which may include associated roadway reconstruction, curbs, sidewalks, and driveway approaches as applicable and within available funding. 

 

Wilcox Avenue Area Drainage

(Quintana Road from Kings Avenue to Wilcox Avenue and Wilcox Avenue from Quintana Road to Dead End) 

$15,400,000 

Install an underground storm drain system which may include associated roadway reconstruction, curbs, sidewalks, and driveway approaches as applicable and within available funding. 

 

Public Art 

$2,550,000 

Provide for the construction, improvement and installation of public art that is accessible to the general public, within the city limits, related to projects in the proposition and in accordance with City Council adopted policies and procedures.

bottom of page